THE SHOT GROUP

Strait of Hormuz transit crew

Your ship transits. Your crew doesn't.

The SHOT Group is a standing transit team held on immediate readiness in Dubai. We board before the Strait, take the vessel through, and hand her back to your own crew on the far side.

About 16 seafarersCovering the minimum safe manning for the passage
Held in DubaiOn hotel standby between transits, ready at short notice
Either directionEastbound and westbound, laden or in ballast

The arrangement

Two crews, one voyage, no time lost.

Your operating crew stays with the ship for everything except the Strait. We relieve them at the anchorage before the transit; they travel by road to the port on the far side and re-board once she is clear. The transfer runs while the vessel is under way, so the passage costs you nothing in schedule.

PORT BEFORE THE STRAIT PORT ON THE FAR SIDE VESSEL THROUGH THE STRAIT — SHOT GROUP ABOARD OPERATING CREW BY ROAD TO THE NEXT PORT

The same sequence runs in reverse for the opposite direction.

  1. Transit team boards

    The SHOT Group boards at the anchorage on arrival and takes over from your crew.

  2. Operating crew steps off

    Your complement disembarks and travels by road to the port on the far side.

  3. The transit

    The SHOT Group takes her through the Strait — and does nothing else on board.

  4. Handover back

    Your crew re-boards and takes over; our team steps off and returns to Dubai.

Proven, not improvised

The same team, transit after transit.

This is not a crew put together for the occasion. The SHOT Group has already taken vessels through the Strait several times over, every transit completed without incident and without delay. Handover at the anchorage, watch and lookout, bridge reporting and challenge procedure are practised ground for them, not read up.

Who they are, what it gives you

A dedicated team, on our books, not yours.

The team

  • About 16 seafarers, covering the minimum safe manning.
  • Held in Dubai between transits, on assignments of about three months.
  • Engaged on our own Seafarer Employment Agreements; high-risk allowance and standby time to our account.
  • Boards eastbound or westbound, laden or in ballast.

What it gives owners

  • Your permanent crew is ashore for the highest-risk hours of the voyage.
  • No time lost: the road transfer runs while the vessel transits.
  • A team that makes this passage repeatedly, not for the first time.
  • One arrangement covering crew, allowances, standby and shore logistics.

What we need to quote

Vessel
Name, IMO number, type and principal particulars.
Passage
Direction of transit and whether laden or in ballast.
Window
Intended date of entry and expected time clear of the Strait.
Ports
Where the team boards and where your crew re-joins.

Enquiries

Reach out to us for further details.

Send the vessel and the transit window and we will come back with the team's availability and the rate for the passage.

transit@shot-group.net